Sign In | Join Free | My ledscreensign.com |
|
Finish : Chrome Plated
Material : Steel
Measurement system : Metric
Place of Origin : Zhejiang, China
Brand Name : nosson
Model Number : 1
Product name : Machine Screw
Head type : Round Head
Surface treatment : Polishing
Application : Industry
Size : M2~M24
Color : Customized Colors
Packing : Cartons+plastic Bags
Keyword : Precision Screws
Certificate : ISO9001:2008
MOQ : 10 pieces
Price : $10.00/pieces 10-99 pieces
Delivery Time : For standard fasteners it take 1-3days. For OEM or ODM products, it takes 10-15 days depend on actual items and quantity.
Payment Terms : T/T
Products | Lead Screws | ||
Website | https://cntqjgj.en.alibaba.com | ||
Standard | ISO,DIN,JIS,ANSI,BSW,GB and non-standard fastener according to customers' drawing | ||
Machines | automatic heading machine,CNC machines, Auto pressing machines,cold header high-precision surface grinder machine, involantary grinder machines,Hardness tester, Electrolytic metrical thickness gauge, Vision Measuring Machine,Thickness Gauge and so on | ||
Material | 1.Stainless Steel: SS201, SS303, SS304, SS316, SS410, SS420 and So on | ||
2.Steel: Carbon Steel,Alloy Steel,Spring Steel and So on | |||
3.Brass:C36000 , C37700 ( HPb59), C38500( HPb58),C27200(CuZn37), C28000(CuZn40),Copper (99% Cu) and so on | |||
4.Aluminum: Al6061, Al6063 etc | |||
5.Free Cutting Steel: 1213, 12L14,1215 and so on | |||
6. Other material,like nylon and plastic and so on. | |||
Surface Finishing | Zn- Plated,Ni-plated,Passivated,Tin-plated,Sandblast and Anodized, Polish,Electro Painting,Black Anodize,Plain,Chrome plated,Hot Deep Galvanize(H. D. G. ) ,Brass Plating,Black Oxide etc. | ||
Heat Treatment | Tempering,Hardening,Spheroidizing,Stress Relieving. | ||
Manufacture Process | Heading/Machining/Threading/heat treatment/plating/Baking/QA/Package/Shipping | ||
Sample | We can supply the samples for free,if the samples we have in stock | ||
Lead time | 10-16 working days as usual,It will based on the detailed order quantity. | ||
Carton size | 35.5*23.5*16 CM &36*24*12.5 CM and according to customer request design | ||
Pallet size | Standard Euro Pallet 110*80*90 CM | ||
After-sale service | we will follow up goods for every customer and help solve problem after sales. |
![]() |
Polishing Stainless Steel CNC Precision Screws ISO9001 2008 Certified 3000mm SFU1204 Ball Screw with Stepper Motor and Long Lead Images |